Tampa Airport Logistics Center

This project will consist of two new 36’ clear height tilt-wall warehouse buildings at 98,000 and 196,000 square feet. NorthPoint Tampa Airport Logistics is a new project that is being constructed on a site used as a trash landfill in the 1960s. Site challenges include coordination of trash removal from the new retention pond to a certified landfill; dewatering operations and installation of a full coverage pond liner in the +/- 4-acre retention pond. All or part of both buildings are protected by a methane gas management system including vapor barriers and venting systems coordinated with the building foundation system.