| Bid Details | Date |
|---|---|
|
|
The hotel includes: sitework, landscaping, parking garage, post tension concrete, GFRC, masonry, metal panels, steel stairs, stainless steel cables, millwork, cultered marble, GFRP panels, waterproofing, PVC roofing, caulking, aluminum composite wall panels, wood and metal doors, glass and glazing, louvers, stucco, drywall, tile, acoustical ceiling, wood flooring, epoxy terrazzo, carpet, wall covering, acoustical insulation, painting, operable partitions, toilet accessories, wall and door protection, wire shelving, TV brackets, safes, shower doors, food service and storage equipment, metal blinds, entrance mats, swimming pool (3rd floor), elevators (hydralic & traction), linen chute, fire sprinkler, plumbing, HVAC (chillers & DX), and electrical. |
|
Plan Availability: Thank you for your interest in working/bidding with WELBRO Building Corporation. If you are not currently a registered subcontractor/vendor with WELBRO, please complete the Profile Form After you have returned the Profile Form |
|
| Last update: 13-may-08 | |


